NTI INSTALLATION MANUALS
Part 7 - Connecting Electrical Service
Connector
Description
HT Selv
No. of Location
Pin
1
120 VAC LIVE INPUT
CN1
POWER SUPPLY
2
120 VAC NEUTRAL INPUT
HT (120V~) AC
3
PROTECTIVE EARTH
1
120 VAC EXT. PUMP2 INPUT / 120VAC LINE DIV1
EXTERNAL PUMP 2 / Hi-V DIVERTER VALVE (DHW)
2
120 VAC NEUTRAL
3
120 VAC EXT. PUMP2 (NO) / 120VAC LINE DIV2
CN2
4
120 VAC LIVE (NO)
HT (120V~) AC
BOILER PUMP
5
120 VAC NEUTRAL
6
120 VAC EXT. PUMP1 INPUT
EXTERNAL PUMP 1 (CH)
7
120 VAC EXT. PUMP1 (NO)
1
120 VAC LIVE
FAN ON/OFF
2
120 VAC NEUTRAL
3
120 VAC LIVE (NO)
CN3
IGNITER
HT (120~) AC
4
120 VAC NEUTRAL
5
120 VRAC + (NO)
GAS VALVE
6
120 VRAC - (NO)
1
120 VAC LINE
CN8
POWER SUPPLY OUT
HT (120V~) AC
2
120 VAC NEUTRAL
CN4
PROTECTIVE EARTH
1
CN7
PROTECTIVE EARTH
1
CN9
PROTECTIVE EARTH
1
1
+5V
NTC HEAT RETURN
2
CH RETURN NTC SENSOR SIGNAL
3
+5V
NTC HEAT FLOW 1
4
CH FLOW 1 NTC SENSOR SIGNAL
SELV (5V)
5
NOT USED
6
CN26
7
+5V
NTC FLUE
8
FLUE NTC SENSOR SIGNAL
9
+24V
AIR PRESSURE SWITCH
SELV (24V)
10
APS DETECTION SIGNAL
11
NOT USED
12
1
GROUND
DHW FLOW SWITCH
2
DHW FLOW DETECTION SIGNAL
3
+5V
WATER PRESSURE SWITCH
4
GROUND
5
CH WATER PRESSURE SENSOR SIGNAL
CN20
6
SELV (5V)
NOT USED
7
8
STEPPER DIVERTER VALVE COIL 1 START
9
STEPPER DIVERTER VALVE COIL 1 END
DIVERTER VALVE
10
STEPPER DIVERTER VALVE COIL 2 START
11
STEPPER DIVERTER VALVE COIL 2 END
Table 20 - Boiler Wiring - 1